ASAHAN PRESTRESSED ROCK ANHCORING

  • Category

    Underground

  • Start Date

    July 2020

  • End Date

    June 2021

  • Client

    PT. Freyssinet Total Technology Shimizu – Adhikarya Joint Operation

  • Location

    Asahan 3 Hydroelectric Power Plant – North Sumatera

  • Scope of Work

    • Water Test
      To measure the permeability of each borehole before installing rock anchor in order to prevent excessive grout material spread and leak
    • Rock Anchor Installation
      To install cable bolts into each borehole for grouting injection
    • Rock Anchor Grouting
      To inject grout material – consisting of cement, water, and admixtures – into each borehole in order to strengthen the rock mass around the tunnel